gantt-to

Gantt charts an AI agent can actually maintain.

Nobody builds a Gantt chart for their own benefit. It is owed to someone else, and it is stale the day after you make it. Your agent already knows the state of the work — point it at one URL and it writes the whole plan in a single HTTP call.

The docs are public — no key, no signup, nothing to install. The example chart opens without an account too. Sign-in to the app itself is invite-only while it is in early access.

A gantt-to chart called Website Relaunch, showing nested tasks, dependency arrows between them, progress on each bar and a milestone diamond on the go-live date.

Twelve tasks, nested three deep, with dependencies and a milestone. One request, no SDK, no second call to resolve ids. Open the live chart.

The problem

The plan is a chore, and it is somebody else's requirement.

Every planning tool ever built assumes you enjoy this. They compete on how pleasant the dragging is. The dragging is not the problem.

You did not want a chart

Somebody asked you for a timeline. It is a report, not a tool, and the people it is for are not the people doing the work.

It is wrong by Tuesday

Scope moves, a date slips, one task splits into three. The chart you spent an afternoon on now quietly misinforms everyone reading it.

Updating it is unpaid

Nobody was hired to keep a Gantt chart current. It is the work you do instead of the work, and it is the first thing to rot.

How it works

Hand the chore to the thing that already knows.

Your agent has read the repository, the tickets and the thread. It is better placed to write the timeline than you are — it just needed somewhere to write it.

Point it at the contract

The whole API is one plain-markdown file at /llms.txt, with an OpenAPI document beside it. No SDK to install, no examples to translate.

It writes the plan by name

Give each task a ref you chose. Nesting and dependencies join by those names, so the agent never has to see a UUID or make a second call.

Send the link

A read-only URL anyone can open, no account required. Next time the plan changes, the agent rewrites it and the link still works.

curl -X PUT $API/v1/projects/$PROJECT/gantt \
  -H "Authorization: Bearer $GT" -H 'Content-Type: application/json' \
  -d '{
    "tasks": [
      {"ref":"design","name":"Design","start_date":"2026-09-01","end_date":"2026-09-07"},
      {"ref":"build","name":"Build","start_date":"2026-09-08","end_date":"2026-09-25"},
      {"ref":"launch","name":"Launch","start_date":"2026-09-30","is_milestone":true}
    ],
    "dependencies": [
      {"predecessor_ref":"design","successor_ref":"build"},
      {"predecessor_ref":"build","successor_ref":"launch","lag_days":2}
    ]
  }'

That is the entire integration. One call replaces the whole chart inside a single transaction — either all of it lands or none of it does.

Built for agents

It fails loudly, not quietly.

An agent cannot notice that a field went missing. So nothing is ever silently ignored, and nothing is ever half-written.

Typos are errors

An unknown or misspelled field is rejected outright, never a silently dropped value. A wrong key in a generated payload surfaces immediately instead of becoming a missing date nobody notices.

Replace or add, never both

PUT /gantt replaces the chart. tasks:batch only applies what you send and deletes nothing. The docs lead with the distinction, because getting it wrong is what costs real data.

Cycles rejected in the database

A dependency loop is refused inside the same transaction as the insert, so a concurrent write cannot slip one past the check.

Nothing half-written

Bulk writes are all or nothing. A rejected task means the chart is exactly as it was, so a failed call needs no cleanup and no guessing about what got through.

Keys that cannot escalate

An API key cannot mint more keys and cannot start a subscription. Both need a signed-in human, so a leaked key cannot compound into anything worse.

Private stays unprovable

A private project you have no role in reports "not found" rather than "forbidden", so the existence of a plan never leaks to someone guessing at URLs.

Who it is for

People who owe someone a timeline.

Consultants and agencies

The plan is the deliverable, and rebuilding it after every scope change is unbillable. Regenerate the whole chart in one call and hand the client a link that needs no account and no licence.

Tech leads and engineering managers

You were asked for a timeline again. Your agent already knows what shipped and what slipped, so let it keep the chart honest instead of spending your Friday on it.

People building agent products

You need somewhere for a planning agent to keep state. A documented contract, machine-readable docs and keys that cannot escalate, so it is not a detour from your actual product.

Not for you if the dragging is the point, or if you need resource levelling, critical-path scheduling or SSO. None of those are built, and saying so now is cheaper than you finding out later.

Plans

The API is not an upgrade.

The full contract, real keys, llms.txt and OpenAPI are on the free plan, no card. Paid plans raise how much you can keep, never what you can do.

Free

$0 forever, no card

One real plan, start to finish.

  • 1 editor, unlimited viewers
  • 3 projects, 100 tasks each
  • 2 API keys, full API
  • Public read-only sharing
Pro

$9 / month

You, your agents, and the timeline you owe somebody.

  • 3 editors, unlimited viewers
  • 2 organizations, 10 projects each
  • 1,000 tasks per project
  • 10 API keys
Studio

$49 / month

A practice running plans for clients.

  • 25 editors, unlimited viewers
  • Unlimited organizations and projects
  • 5,000 tasks per project
  • 25 API keys

Viewers are free, on every plan, forever. You are never charged for the people you have to show the plan to — only for the people who change it.

What each plan allows, exactly

Every limit is readable at runtime from GET /v1/plans, so a client never hard-codes them. Going over a limit refuses the new thing with a 402 — it never deletes what you already have.

Capability Free Pro Studio
Price per month $0 $9 $49
Editors per organization 1 3 25
Viewers Unlimited Unlimited Unlimited
Organizations owned 1 2 Unlimited
Projects per organization 3 10 Unlimited
Tasks per project 100 1,000 5,000
API keys 2 10 25
Full REST API, llms.txt, OpenAPI Yes Yes Yes
Bulk chart writes with ref Yes Yes Yes
Public read-only sharing Yes Yes Yes

Scroll the table sideways to see every plan.

Prices are in US dollars. Billing is not open yet — nothing can be charged today, and everyone who signs up before it opens keeps the price they signed up at.

Questions

The things people actually ask.

Why not just use a spreadsheet?

Because you are not the one editing it. A spreadsheet will not refuse a dependency cycle or reject a misspelled field, and an agent rewriting one twice a week corrupts it quietly. You find out when somebody acts on a wrong date.

My project tool already has an API.

It does, and it was built for syncing between systems rather than for authoring. Ask it to accept a whole plan — tasks, nesting and dependencies wired by names you chose — in one call, and see what happens.

Is there AI in the product?

No, and that is deliberate. There is no model inside gantt-to. It is a plain, boring, well-specified place for your agent to put a plan, which is why it behaves the same way every time.

What happens when the agent gets it wrong?

The write is refused and the chart is unchanged. That is the design, not a fallback: bad input fails at the boundary with a status code, so a failed call needs no cleanup and never leaves half a plan behind.

Is my plan public?

Only if you make it so. Private is the default, and someone with no role in a private project cannot even confirm it exists. Public sharing is one setting, free on every plan.

Will this still be here in a year?

A fair question, and no answer to it is worth much. What we can say is checkable: the contract is versioned and machine-readable, the docs are served as plain text, and your data comes back out through the same documented API it went in through.

Stop maintaining the chart.

One URL for your agent, one call to write the plan, one link for the person who asked. Nothing to install and no card to enter.

Sign-in is limited to invited testers while the app is in early access.